Current Controlled Areas


Controlled Areas DESY

Comment

Linac2 tunnel buil. 24 incl. PIA
Linac2 modulator hall buil. 24  
DESY tunnel  
DESY center buil. 20  
PETRA3 tunnel only between N und NO in the range of FLASH crossing
PETRA3 "Lüfterhäuschen"  
FLASH tunnel, FLASH Extract tunnel, FLASH2 tunnel  
FLASH, hall 3, "Ostgang"  
HERA WL as far as ca. 160m
Buil. 31a incl. area in front

Controlled Areas XFEL

Comment

XFEL Injector: XSIN, XTIN1 XSIN: UG7 from IL door XTIN1
XFEL Main Linac: XSE, XTL, XS1 XSE: all accelerator areas below rad. prot. ceiling,
XS1: UG2 and UG3
XFEL SASE1: XTD2, XS3 XS3: UG1 and UG2, only up to fire prot. door XTD9
XFEL SASE3: XTD4, XSDU2 XSDU2: only up to IL door XTD10
XFEL SASE2: XTD1, XS2 XS2: UG1 and UG2, only up to fire prot. door XTD6
XFEL XTD3, XS4 XS4: UG1 and UG2, only up to fire prot. door XTD8
XFEL XTD5, XSDU1 XSDU1: only up to IL door XTD7

Last change: 29/03/2018 by Norbert Tesch